Case study: Contingency gas-power for immediate requirements of 14 MW

Billy Durie , Critical Service Development Manager, Aggreko

This session will outline how feasible it is to deliver 14 MW of emergency power in a very short amount of time. As data centers are being constructed at such a speed that in some cases the local infrastructure just cannot keep up with demand. Temporary gas-generated power makes perfect sense for data centers that need to be operational before a connection is available from the local power supplier, or simply where there is not enough capacity from the grid. Join this session and find out how you can overcome your power availability challenges from the very beginning of your construction.

Power + Cooling

Brought to you by

Aggreko